Projects
MINING CAMP
The challenge was to design, build and start up a treatment process within 6 months, at temperatures as cold as -40°C.
ANAEROBIC DIGESTION FACILITY
Dealing with different types of incoming waste, the City had to select a treatment chain that would allow it to achieve its transformation and reclamation objectives.
LANDFILL SITE
To substantially increase the capacity of the treatment plant using the existing basins and footprint. The treatment process had to be able to treat water with variable loads and flows.
PETROCHEMICAL
In partnership with the client, pilot testing was conducted over a continuous four-month period. All significant discharge limits needed to be met within a few days.
PETROCHEMICAL
The water to be treated contained high concentrations of complex organic compounds, generally difficult to biodegrade.
SLAUGHTERHOUSE
In partnership with the client's consultant, a treatment chain had to be designed in order to recover up to 50% of the process water while meeting Health Canada's high sanitary criteria.
GROCERY STORE
Design a reliable treatment process that provides consistency and remote monitoring.