Projects

MUNICIPALITY

MUNICIPALITY

Restricted footprint and limited power supply.

Case Study

MINING CAMP

MINING CAMP

The challenge was to design, build and start up a treatment process within 6 months, at temperatures as cold as -40°C.

Case Study

REAL ESTATE DEVELOPMENT

REAL ESTATE DEVELOPMENT

Meet very strict discharge requirements at all times.

Case Study

ANAEROBIC DIGESTION FACILITY

ANAEROBIC DIGESTION FACILITY

Dealing with different types of incoming waste, the City had to select a treatment chain that would allow it to achieve its transformation and reclamation objectives.

Case Study

LANDFILL SITE

LANDFILL SITE

To substantially increase the capacity of the treatment plant using the existing basins and footprint. The treatment process had to be able to treat water with variable loads and flows.

Case Study

PETROCHEMICAL

PETROCHEMICAL

In partnership with the client, pilot testing was conducted over a continuous four-month period. All significant discharge limits needed to be met within a few days.

Case Study

PETROCHEMICAL

PETROCHEMICAL

The water to be treated contained high concentrations of complex organic compounds, generally difficult to biodegrade.

Case Study

SLAUGHTERHOUSE

SLAUGHTERHOUSE

In partnership with the client's consultant, a treatment chain had to be designed in order to recover up to 50% of the process water while meeting Health Canada's high sanitary criteria.

Case Study

GROCERY STORE

GROCERY STORE

Design a reliable treatment process that provides consistency and remote monitoring.

Case Study

Mabarex Newsletter

Keep up-to-date on the latest technical information, regulatory trends, industry developments, and news from Mabarex.


Note: You may unsubscribe at any time.